South Africa is shopping at the wrong layer of the AI stack. Every model, however clever, runs on silicon, and a country that neither designs, makes nor chooses its own chips does not have AI sovereignty. It has a lease.

In San Jose, President Ramaphosa pitched South Africa as ‘Africa’s home for AI infrastructure’, noting that about 70% of the continent’s data centres are already here. That is the data-centre layer: land, power and cooling for other people’s compute. It is not where value or control sits. AI chips generated roughly half of global semiconductor revenue in 2026 while making up under 0.2% of chip volume. We are bidding to host the building and importing the engine.

Chip sovereignty starts with the instruction set

The place to start is cheaper than a fab. The instruction set is the contract between software and silicon, and whoever owns it owns the dependency. A chip programme tied to a foreign-controlled architecture licence carries strategic risk.

RISC-V removes that dependency. It is open, royalty-free and controlled by no single company or country, and it is overseen by a Swiss-based nonprofit. Others have noticed. The EU places RISC-V at the core of its technological sovereignty plans, and China’s latest five-year plan for electronics manufacturing calls for RISC-V chips for AI. Presenters at a European summit argued that emerging economies can use open silicon to leapfrog into compute capability.

ARM is the pragmatic partner. AWS, Google and Microsoft chose Arm because its software ecosystem is more mature and lower-risk. But Arm is moving from neutral licensing into building its own AI chips, which puts it in competition with its customers. License ARM to deploy now. Build RISC-V capacity to be free later.

Hosting is the floor-space trap

Our data-centre ranking flatters us. South Africa has four AI-focused data centres, tying with South Korea and Australia, but all four are foreign-owned. Parity on headcount hides a gulf in scale: our largest data centre runs at 70MW, while South Korea has a 3GW site slated for completion in 2028.

Hosting also leaves the hard questions open. The President himself conceded that data centres alone will not deliver the jobs and industrial development we seek. His spokesperson admitted that no technical details on water and electricity needs have been worked out, and analysts warn of a fragile grid under strain from AI loads. We would be spending scarce electricity so that foreign firms can run foreign chips.

We do not need a leading-edge fab to begin

The caveat is real. Wafer fabrication demands billions in investment, and analysts see large-scale fabs as unlikely in the near term. But the choice is not fab or nothing. Assembly, testing and packaging is far cheaper to establish and can be a stepping stone toward design and fabrication. Chip design, components and minerals processing are realistic entry points, and the CSIR gives us a research base. Our minerals are the obvious lever: Africa’s critical minerals are mined here but typically refined abroad. Design needs engineers, not a multi-billion-rand plant.

Packaging puts people to work; racks do not

The jobs argument is where the layers differ most, and it is the one the President has already conceded. Data centres are among the least labour-intensive structures in the economy, promising only dozens to a few hundred permanent workers while the construction jobs are temporary. Highly automated hyperscale campuses can run with as few as 20 to 30 permanent staff per 100 megawatts. Running inference needs facilities technicians, maintenance crews, network operators and security guards, and not many of them.

Assembly, testing and packaging is the opposite kind of industry. Back-end semiconductor work remains relatively labour-intensive because it has not yet fully adopted automation, and it draws on a spread of skills: technicians on the line, quality and test engineers, materials and process specialists, and the logistics around them. That is a ladder of jobs from entry-level to graduate engineer, not a handful of operators in a cold room. For scale, ASE, the world’s largest outsourced assembly and test provider, has roughly 65,000 employees. That is no forecast for South Africa, but it shows the order of magnitude a packaging business can reach.

The honest caveat is that automation is advancing, so the labour intensity of packaging is a window and not a promise. Even so, a country asking where its AI jobs will come from should look at the layer that employs people before the layer that employs transformers and chillers.

The other side

Defenders of the current approach argue that hyperscalers will only expand local AI compute once South African enterprises use AI at scale, and that sovereign compute matters when around 90% of AI data-centre capacity sits in China and the US. RISC-V also has real maturity gaps: Arm’s ecosystem remains dramatically larger and will stay ahead for several years, and RISC-V has no compute advantage today, although server-class parts are now shipping. Those are arguments for sequencing the chip layer, not for skipping it.

It is about layers

Sovereignty is built from the bottom up, and every layer we do not control is a dependency for the layers above it:

  1. Minerals and materials: mined here, refined abroad.
  2. Chips: designed, made and licensed abroad.
  3. Compute: hosted here, owned abroad.
  4. Models: the layer where the sovereignty conversation usually stops.
  5. Applications: where jobs and public services reach citizens.

The President says we should be producers rather than mere consumers of AI innovation, and he has asked for practical initiatives within 90 days. Our strategy is aimed at layer three. The 90-day list should aim deeper: a national RISC-V and ARM design programme at the CSIR and universities, an assembly and testing capability, minerals beneficiation, and local-content conditions on every data-centre incentive. Build the bottom layers first, or we will own the model and rent everything underneath it.